Mumbai Trans Harbour Link Project Package I

ESC provided full steel fabrication works for bridge girders, crossbeams, floor beams, and decking panels for a total length of over 960 meters in India.

 

 

Temporary Access Bridge Project

​

The Mumbai Trans Harbour Link (MTHL), is an under-construction 21.8 km, freeway grade road bridge connecting the Indian city of Mumbai with Navi Mumbai, its satellite city. When completed, it would be the longest sea bridge in India. The sea link will contain a 6 lanes highway, which will be 27 meters in width, in addition to two emergency exit lanes, edge strip and crash barrier.

​

Material Grade: ASTM A36/A36M or GB/T700 Q235B with yield strength min. 250 MPa

​

All raw materials are visually inspected, dimension checked, traceability checked, and review mill test certificate during the incoming process. Major components will be retested in 3rd party lab to ensure the mechanical properties and chemical compositions are acceptable.

​

ESC has assigned inspectors to monitor the entire ship loading process to ensure safe, secure, and sufficient protection to prevent damages during the shipping process.

​

esc supplied bridge girder to mumbai trans harbour link project
bridge girder fabrication
Bridge girder for Mumbai Trans Harbour Link

Production & Painting Photos

Loading, Packing and Stacking

Installation on Site